Get Adobe Flash player
 
IntroductionLocation MapLayout PlansSpecificationsGallery



SPECIFICATIONS - Phase 1 & 2

SPECIFICATIONS DOUBLE STOREY TERRACE HOUSE (Intermediate)
STRUCTURE
Foundation
Wall
Roof
Ceiling
Windows
Doors
: Reinforced Concrete
: Sandbrick with Cement Plastering
: Concrete Roof Tiles
: Fiber Plaster Ceiling/Skim Coat/Cement Plaster
: Aluminium Framed Glass/Metal Frame with Fixed Louvres
: Solid Timber Door/Plywood Flush Door
  Sliding Glass Door (Corner Unit Only)
FLOOR FINISHES
Living, Dining, Bedroom & Family Hall
Kitchen, Bathroom & Staircase
Store & Wet Area
Car Porch & Driveway
: Ceramic Tiles
: Ceramic Tiles
: Cement Render
: Concert in-print

WALL FINISHES
Dry & Wet Kitchens
Bathroom 1, 2 & 3
Other Areas
: Approximately 1500mm High Ceramic Tiles
: Approximately 2100mm High Ceramic Tiles
: Paint & Plaster

SANITARY INSTALLATION
Aluminium Sink
Sitting WC
Wash Basin
Shower
: 1 No. of Single Bowl Aluminium Sink
: 3 Nos.
: 3 Nos.
: 3 Nos.

ELECTRICAL INSTALLATION
Light Point
13A Plug Point
Fan Point
Telephone Point
Door Bell Point
TV Socket Point
Air-Cond Point
Water Heater Point
: 22 Nos.
: 13 Nos.
: 6 Nos.
: 2 Nos.
: 1 No.
: 1 No.
: 2 Nos.
: 2 Nos.

EXTERNAL WORKS
Fencing
Painting
: Mild Steel on Brickwall/Chained Link
: Weather Resistant Paint/Emulsion Paint/Gloss Paint


The information contained herein is subject to change and will not form part of an offer or contract. All items stated above are subject to variations, modification as to comply with the relevant Authorities and by-laws when arise.


 
KASEH HEIGHTS, Semenyih
OPEN FOR SALE

Price from RM798,000
FACTORY, Bandar Teknologi Kajang

A Turnkey Project
TAMAN DESA MEWAH, Semenyih

All the units were fully sold and were completed with the issuance of Certificate of Fitness and vacant possession delivered on June 2013
TAMAN VILLA @ Bandar Teknology Kajang

All the units were fully sold and were completed with the issuance of Certificate of Fitness and vacant possession delivered on June 2012
4-STOREY SHOP OFFICE, Setapak

All the units were completed with the issuance of Certificate of Fitness and vacant possession delivered on June 2010
[ Disclaimer ] [ Private Policy ] Copyright © 2013~2015 HYK Land & Development Sdn Bhd (763957-P) All rights reserved.